Harvey Hv3 Water Softener Installation Manual -

Locate the main water shut-off valve and turn it clockwise to shut off the water supply to the house. Open a nearby faucet to drain the water from the pipes.

Connect a 1/2-inch hose to the overflow plastic nipple on the side of the cabinet. Run this hose downward through an outside wall. Because this is a gravity-fed line, it must never run upward. Step 6: Commissioning the System

Always keep salt blocks in the unit. If it runs out, your water will turn hard again. harvey hv3 water softener installation manual

This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.

Because the Harvey HV3 is a non-electric system powered entirely by water displacement, maintenance is minimal. Routine Maintenance Locate the main water shut-off valve and turn

Ensure the drain line does not exceed a total length of 3 meters, and does not rise more than 1 meter above the base of the softener. Step 3: Install the Overflow Line

Identify the (arrow pointing in) and Outlet (arrow pointing out) ports on the back of the Harvey HV3. Run this hose downward through an outside wall

Ensure all shutoff valves are in good working order. You should have easy access to a stopcock that can completely isolate the main water supply to your property.

The salt chamber should never be allowed to drop below approximately 15cm in depth measured from the base of the brine cabinet.

Before you begin, ensure you have the following:

Wir nutzen Cookies und Scripts auf unserer Website. Einige davon sind essenziell, während andere uns helfen, diese Website und dein Nutzererlebnis mit ihr zu verbessern.
Die Widerrufsmöglichkeit befindet sich in der Datenschutzerklärung. 
Individuell anpassen. Individuell anpassen.
Alle Akzeptieren